products

Alkyd blending paint Waterborne alkyd antirust paint Waterborne protective paint Excellent adhesion, good protective performance of paint film

short description:

Water-based protective paints
Clean up the tools When the construction is finished, the tools should be rinsed with water immediately to prevent them from drying out, and the remaining paint should be kept in a closed container.
Note: This product should not be mixed with any oil-based paint or organic solvent. 2.
2. Avoid contacting with organic solvent and water before the paint film is completely dry, and do not press or rub heavily to avoid destruction of paint film.
Product.
Main characteristics 1. Water dilution, low VDC, safe and environmental protection. 2. High solid content, high cost performance.
3. fast drying speed, easy construction. 4. Excellent adhesion, good protective performance of paint film.
Recommended use Mainly used for industrial equipment, steel structure, civil facilities, etc., light to moderate anti-trapping, anti-flat surface coating requirements. It can also be used for maintenance repair protective primer. Suitable for anti-corrosion requirements under the general environment.


Product Detail

Product Tags

HTB1WYDhazLuK1Rjy0Fhq6xpdFXaj.jpg_.webp
HTB1FI9VxDdYBeNkSmLyq6xfnVXab.jpg_.webp
微信图片_202008061030133
H8aa56066474e4e79b1dd2bbbf11113faL.jpg_.webp
微信图片_2020080610301317
Haa50c5a24c6d4dfdb553308c8f447d371.jpg_.webp

Application

Construction Environment The construction site should be well ventilated and dusted to ensure construction quality.

The construction environment should be not less than 5' and relative humidity should be <70%.

The temperature of the substrate should not be less than 5', and the well should be more than 3℃ above the dew point of the air.

Cleaning of tools After construction, the tools should be immediately rinsed with water to prevent dryness, and the remaining paint should be kept in a closed place.

Caution 1. This product should not be mixed with any oil-based paint or organic solvent.

Avoid contact with organic solvents and water before the paint is completely dry, and do not press or rub heavily to avoid destruction of paint film. If the recoating time is too long, it is easy to cause secondary pollution. If the repainting time is too long, it is easy to cause secondary pollution, and must be polished before repainting. 4.

HTB1llpYaIfrK1RkSmLyq6xGApXaG.jpg_.webp
HTB1wXRSKxYaK1RjSZFnq6y80pXaj.jpg_.webp
HTB1WYDhazLuK1Rjy0Fhq6xpdFXaj.jpg_.webp
Hea54edef1b94450e88026c128b73f2b4g
1575968797569054
H4dbfbf1b044f420996775a9e8b1b5056y

Quick Details

workers should wear necessary labor protective equipment.

Store in a dry and ventilated place (5-40℃) for 12 months, after this period, it can still be used after inspection.

Loading and unloading should be done carefully and gently to avoid collision and leakage.

Packing specification: 20kg or 50kg in general. Iron drum or plastic drum. (Packed in different specifications according to user requirements)

Safety and health The following measures shall be guaranteed during construction.

Avoid contact with skin and eyes. If the water-based paint comes in contact with skin, wash with warm water. If the water-based paint comes in contact with the eyes, wash with warm water.

Flush well with plenty of water and get medical attention immediately.

Keep out of reach of children.

Hd031cc143ed042b4910abdaacde0b0cec.jpg_.webp
27e52fbb9549049db355ee507081b9a
IMG_0002
验厂报告
Hef230fa245204a01a89445508302629d3.jpg_.webp

Keep out of reach of children.

Observe all health and safety regulations on site.

For detailed information on health and safety and precautions for use of this product, consult the technical instructions.

Water-based protective paints

Clean up the tools When the construction is finished, the tools should be rinsed with water immediately to prevent them from drying out, and the remaining paint should be kept in a closed container.

Note: This product should not be mixed with any oil-based paint or organic solvent. 2.

2. Avoid contacting with organic solvent and water before the paint film is completely dry, and do not press or rub heavily to avoid destruction of paint film.

The workers should wear necessary labor protective equipment.

Storage: 12 months (indoor dry and ventilated place 5-40℃C), after this period, it can still be used after inspection.

Loading and unloading: Carefully and gently unload the product to avoid collision and leakage.

Packing specification: 20kg or 50kg in normal containers. Iron drum or plastic drum. (Different specifications are packed according to user requirements)

HTB1ST_HxhGYBuNjy0Fnq6x5lpXa9.jpg_.webp
HTB1PPqNKVXXXXbZXpXXq6xXFXXXW.jpg_.webp
H44e615a6a00e450b8fb9451cd0fb0d3cr.png_.webp

Safety and Health Avoid contact with skin and eyes. If water-based paints come in contact with skin, wash with wet water. If water-based paint comes in contact with eyes, rinse well with plenty of water and seek immediate medical attention.

No eating, smoking or other unsafe practices are allowed on the site; keep out of the reach of children.

Observe all health and safety regulations on site.

For detailed information on health and safety and precautions for using this product, please refer to the technical manual.

 

Waterborne Epoxy Industrial Protection Paint

Construction environment Construction temperature 10℃-40℃

Relative humidity ≤70%

Substrate temperature 5°C above dew point

Well ventilated. There must be a combination of positive and negative air pressures.

N,N-Diethylaniline
环保废气处理设备
Hcf2642af0cf641d1816dddb1171cb7d2w.jpg_.webp

Cleanliness Dust-free

Caution 1. This product should not be mixed with any oil-based paint or organic solvent.

2. The curing agents used for different types of paints should not be mixed.

3. It is forbidden to contact with acid and alkali during the process of paint preparation and coating.

4. Wear the necessary protective equipment at the construction site.

5. After the curing agent is prepared for this series of products, it should be used within the applicable period under the condition that there is no pollution.

You cannot use it.

Typical painting kit Select the kit system according to the requirement. This product can be used alone or in combination with most of our water-based or solvent-based medium and topcoats.

Storage 12 months (indoor dry and ventilated place 5-40℃), after this period, it can still be used after passing the test.

Packing specification: component A: 20kg/barrel, component B: 3kg/barrel.

 

 

IMG_0002
危险品证书
packing

Characteristic description

No toluene, ethylbenzene, xylene and other benzene series, low VOC, formaldehyde, heavy metal content lower than the national standard, no irritating odor, no harm to human body; 3. Normal temperature drying or low temperature baking, strong film adhesion, good compatibility with various water-based topcoats and solvent topcoats; 4. Excellent rust-proof, anti-corrosion performance.

Product application

Petrochemical equipment, doors and windows, fences, radiators, automotive chassis, water pumps, agricultural vehicle parts, etc., anti-corrosion coating on the surface of metal facilities.

 

1 substrate treatment: simple removal of oil and rust can be constructed.
2 Construction method:
(1) brush coating, roll coating, spraying and dip coating.
(2) Spraying is recommended. It is recommended to add 5%-20% water. It is suitable for spraying viscosity (40-60S, 25 ℃, 4# cups) at construction site.
3 construction conditions:
In the air relative humidity less than 85% weather construction, to avoid rain, snow, fog, windy weather, painting temperature is 5 ℃-40 ℃
4 construction process:
(1) Add appropriate amount of water to the paint, stir evenly, so that the viscosity is between 40-60S; use 80-120 mesh screen to filter, to be used;
(2) Hanging the processed workpiece with a hanger, then adding the paint to the spray gun, the spray gun pressure is controlled at about 0.2-0.4 Mpa.
The paint can be baked at low temperature. After 10 minutes of leveling, it can be baked at 80-100 (?) C for 15 minutes.
(3) after the first stop, the 12h can be sprayed second times after natural drying.
(4) After the workpiece is sprayed, the redundant paint in the spray gun bucket is poured back into the paint barrel. If it is not used for a long time, the paint barrel should be sealed to prevent moisture evaporation and crust.
(5) clean the spray gun with clean water to prevent clogging.
(6)natural drying 24h or low temperature baking requirements are finished. After the workpiece is cooled, the workpiece is packed and put into storage.

Packaging:

Major Primer A: 30kg/container

Curing Agent B: 3kg/container

 

Product Description HD-158, high solid epoxy zinc rich anti-corrosive primer, is composed of two-component metal protective primer composed of epoxy resin, zinc powder, polyamide, etc.
Product Feature High solid coating with high zinc content.

Excellent anti-corrosion and cathodic protection.

Meet the composition requirements of SSPC PRIMER 20 and HG/T 3668-2009.

Recommended Use Suitable to use as long-term protective primer on the parts which exposure to C5-I or C5-M (ISO 12944-2) high corrosion environment, such as petrol storage tank and equipment, power station, bridge, marine facilities, steel structure, port machinery, outdoor equipment etc. It is long-lasting anti-corrosion in combination with other coatings.

 

微信图片_20200611150908
H04d60ad774c3480ab6e5fb487ae80bb61.jpg_.webp (1)
微信图片_20200805093655
微信图片_202008050937531
微信图片_202008050937532

  • Previous:
  • Next:

  • Write your message here and send it to us