products

Epoxy anti-corrosion zinc-rich primer Waterborne inorganic zinc rich primer

short description:

Waterborne inorganic zinc rich primer
Product Description This product is prepared by water-based Bin Metal Ting energy salt emulsion, water-based additives, zinc powder (made of, A, B two-component independent packaging. Zinc content 30%-60%, can be customized according to anti-corrosion level requirements.
1.Port frozen, underground dining, engineering machinery, water conservancy road, power facilities, mining equipment, chemical equipment and other steel table painting corrosion.


Product Detail

Product Tags

HTB1VcmGch6I8KJjSszfq6yZVXXaf.jpg_.webp
HTB1TmyOchPI8KJjSspoq6x6MFXaS.jpg_.webp
He5cf346e4d704e1da30f5552a54d79c9I.png_.webp
HTB1ZKIHXuH2gK0jSZJnq6yT1FXaX
Hea6b56f8c1d14a61bd708a6470224a8aS.png_.webp
H99759f3f388946a18c28267e78a1a7a6V.png_.webp

Application

2. Steel structure window primer for construction projects.

3. Ship use.

4、Other anti-corrosion applications

1. Extremely low vOC, dilute with water, environmentally friendly products.

2. Each component is non-flammable and non-explosive, and can be transported as non-dangerous chemicals.

3. Excellent cathodic protection, anti-rust and salt spray resistance.

4. Excellent moisture and quick drying.

5. High temperature resistance, continuous temperature resistance 500℃C, high temperature resistance 1200' between items.

Colour Zinc grey

solid content

Eighty percent.

30%-80% zinc in non-volatile fraction

glossy

Drying time (25°C) without light

Surface dry 0.2 hours

5 hours on the ground

Hardness of paint film 7 days complete due to chemical

Paint film adhesion

Salt spray resistance (100ur) H Class 1

Theoretical coating rate 300h-1200h

5mf/kg (60μm dry film)

Construction method Proportioning

Construction method Component A:Component B=3:7

Air spray/airless spray

thinner

Dilution amount Clean water

Nozzle size 0-10%

Spraying pressure 1.5-2.5m

Application period 0.4-0.6Mpa

Coating kit 5h (at 20°C)

Choose a matching system for Genoa requirements. This product can be used with most of our water-based solvent-borne intermediate and top coats.

H99759f3f388946a18c28267e78a1a7a6V.png_.webp
He5cf346e4d704e1da30f5552a54d79c9I.png_.webp
HTB1ZKIHXuH2gK0jSZJnq6yT1FXaX
H2630adb5a94f468a8dad9dc1dd035e22p
H803d5001b5994c27b9b54df16ba01476K.jpg_350x350
H6f7df850922a41198b905fec67ba7983T

Quick Details

Packing specification: A component: 15kg/barrel B component: 35kg/barrel or A component: She/Yang B component: 21kg/barrel.

Surface treatment and other description data are the same as "H601 Waterborne Epoxy Zinc Rich Primer", please refer to it.

Cleanliness Dust-free

Caution 1. This product should not be mixed with any oil-based paint or organic solvent.

2. The curing agents used for different types of paints should not be mixed.

3. It is forbidden to contact with acid and alkali during the process of paint preparation and coating.

4. Wear the necessary protective equipment at the construction site.

5、After this series of products are matched with the trapping agent, they should be used within the applicable period under the condition that they are not contaminated, and they cannot be used beyond the applicable period.

Typical supporting system for painting. This product can be used alone or in combination with our water-based medium paint and topcoat.

Storage: 12 months (indoor dry and ventilated place 5-40'), after this period, it can still be used after passing the test.

Packing specification: Component A: 18kg/barrel Component B: Zhg/barrel

Hd031cc143ed042b4910abdaacde0b0cec.jpg_.webp
27e52fbb9549049db355ee507081b9a
IMG_0002
验厂报告
10971655454_1346530587

Waterborne epoxy zinc rich primer

Construction environment Construction temperature 10℃C-40℃C

Relative humidity ≤70%

Substrate temperature 5°C above dew point

Well ventilated. There must be a combination of positive and negative air pressures.

Cleanliness Dust-free

HTB1ST_HxhGYBuNjy0Fnq6x5lpXa9.jpg_.webp
HTB1PPqNKVXXXXbZXpXXq6xXFXXXW.jpg_.webp
HTB1TmyOchPI8KJjSspoq6x6MFXaS.jpg_.webp

Waterborne epoxy zinc rich primer

Product Description This product is prepared by water-based cyclic atmosphere steel, water-based additives, zinc pine, water-based epoxy curing agent, deionized water, etc., A, 6 two-component independent packaging, zinc content of 30%-80%, can be customized according to anti-corrosion level requirements.

1. port refining, underground pipelines, engineering machinery, water conservancy equipment, power equipment, mining equipment, chemical equipment and other steel surface corrosion.

2. Anti-corrosion primer for steel structures in construction projects.

3. Marine application

N,N-Diethylaniline
环保废气处理设备
H592047f04a9540b684c562e527de276dk.jpg_.webp

Other anti-expiration applications

1. Extremely low VOC, water dilution, environmentally friendly product.

2: Non-flammable and non-explosive, can be transported as non-dangerous chemicals.

3: Excellent physical and mechanical properties. 4: Excellent water resistance, alkali resistance and salt spray resistance.

4: Excellent water resistance, alkali resistance and salt spray resistance.

Technical parameters Color Zinc grey

solid content

Zinc in non-volatile fraction 8ON

30%-80%

glossy

matte (colorless)

Drying time (25℃℃) is shown in 1 hour.

Actual 24 hours

7 days of full factorization

Drying (70-80')

Film hardness 2 hours dry

Pale film adhesion H

Level 1

lacquer stock is soft and robotic (in nature)

Paint film impact resistance 2mm

Salt resistant 50cm. kig

Theoretical coating rate 100h-B0Oh

5m/kg (60μm dry film)

Construction method Proportioning

Construction method Component A: Component B=9:1

Airbrush/airless spraying

thinner

IMG_0002
危险品证书
packing

Dilution amount Clean water

Nozzle size 5-15%

Coating pressure 2-2.5mm

Applicable period 0.4-0.6 Maa

2h (at 20°C)

Surface treatment Before construction, the surface should be treated without oil, rust, dust and dirt.

Steel: Shot blasting and sandblasting methods such as blasting to Sa2.5 level, where sandblasting can not be mechanical polishing or chemical treatment should be done

To achieve St3 rating.

This product can be used on other substrates, please consult our technical service staff for details.

 

 

微信图片_20200611150908
HTB1rEqJXQfb_uJkHFJHq6z4vFXaB.jpg_.webp
微信图片_20200805093655
微信图片_202008050937531
微信图片_202008050937532

  • Previous:
  • Next:

  • Write your message here and send it to us