products

Polyurethane Water Paint Waterborne polyurethane hammertone paint Low vOC, non-radical odor, environmentally safe

short description:

H2001 Waterborne polyurethane hammertone paint
Product Description The special imported water-based trapezium, the national chemical science, deionized water, water-based additives and environmental protection filler and other components, does not contain benzene, a family, second-grade benzene and other organic solvents.
Main features: Low vOC, non-radical odor, environmentally safe.
Tough, wear-resistant and scratch-resistant after coating.
Can be used on all kinds of primers and primers, with excellent adhesion.
Recommended Uses It is used for anticorrosive coating of large machinery, industrial equipment, accessories, power distribution equipment and motors.


Product Detail

Product Tags

HTB1WYDhazLuK1Rjy0Fhq6xpdFXaj.jpg_.webp
3784263e5abf6811eed7caeddce4225
d3103e9a89a69f94fbd614e3a1469b5
HTB1ZKIHXuH2gK0jSZJnq6yT1FXaX
ca6a5eba1495e781217e058fe41de69
a2b85cefd0a02d801b0b72ea1cab5dc

Application

Can be used on all kinds of primers and primers, with excellent adhesion.

Recommended Uses It is used for anticorrosive coating of large machinery, industrial equipment, accessories, power distribution equipment and motors.

Technical parameters Drying time (25℃℃) Surface dry 1 hour

Hands-on 24 hours

dryer

Fully Factorized 7 days 1 hour (60-80°C)

Gloss ≥80%

Varnish hardness

Paint film adhesion

Paint film flexibility

1mm

Paint film impact resistance

Resistant to artificial ageing 50cn, kg

500h

Surface treatment When painted directly on the surface of Yu material, the substrate should be polished, requiring clean, dry, no rust, no oil stains, etc. When painted on the bottom surface, the primer surface is required to be clean, dry and free of dirt.

d3103e9a89a69f94fbd614e3a1469b5
H592047f04a9540b684c562e527de276dk.jpg_.webp
HTB1WYDhazLuK1Rjy0Fhq6xpdFXaj.jpg_.webp
HTB14pSPchrI8KJjy0Fpq6z5hVXa4.jpg_.webp
HTB1VcmGch6I8KJjSszfq6yZVXXaf.jpg_.webp
He5cf346e4d704e1da30f5552a54d79c9I.png_.webp

Quick Details

Use conditions Construction temperature 10-35 ℃, humidity 30-75%, good ventilation conditions.

Construction Instructions Ingredients Ingredients A, B two components

Mixing ratio 20:3 (weight ratio)

Mixing method: Mix component A thoroughly, add component B and continue to mix until uniform.

Theoretical dosage 4-tmi/(60-80μm)

Boiling period (25℃℃) 5-10min

Suitable period (25°C) 2h

Front road primer Water-based primer, water-based anti-corrosion primer, oil-based primer, etc.

Surface treatment The lacquer film must be dry.

Remove the oil, dust and other dirt from the front paint mirror, and no acid or water condensation on the paint film.

For the topcoat that has been cured for a long time, the paint film must be polished with sandpaper before the subsequent topcoat can be applied.

Hd031cc143ed042b4910abdaacde0b0cec.jpg_.webp
27e52fbb9549049db355ee507081b9a
IMG_0002
验厂报告
Hef230fa245204a01a89445508302629d3.jpg_.webp

Temperature of the substrate The temperature of the substrate should be 3'C above the dew point.

Application Soft Method Air Spray Thinner Deionized Water

Dilution 0-10% (by weight of the paint)

Nozzle diameter 1.5-2.0mm

HTB1ST_HxhGYBuNjy0Fnq6x5lpXa9.jpg_.webp
HTB1PPqNKVXXXXbZXpXXq6xXFXXXW.jpg_.webp
HTB1Fi1ZccLJ8KJjy0Fnq6AFDpXac.jpg_.webp

Fishery pressure 0.3-0.4Mpa (approx. 3-bhg/cm)

Please refer to the same data as "H201 waterborne silver powder paint" for details.

Water-based silver powder paint

Wash the tools and equipment with water immediately after construction.

Storage period 12 months (indoor dry place 5-40 ℃), beyond this period, after passing the test, it can still be used.

1. The surface must be clean and dry, and the surface treatment of the substrate must meet the requirements.

N,N-Diethylaniline
环保废气处理设备
HTB1ByeWaqLN8KJjSZFGq6zjrVXa7.jpg_.webp

The tools used in the construction must be dry and clean. 3.

3. it is forbidden to contact with acid and alkali during the process of paint preparation and coating. 4.

4. the painting interval must be strictly controlled, when the temperature is 25'C, the painting interval shall not be less than 12 hours.

5. Can not paint thick, a film can not exceed 40μm or will bubble.

6. Construction and drying and curing during the relative humidity is not greater than 75%, the temperature can not be less than 0 ℃ C, otherwise the film can not be completely cured influence.

Performance.

7. This product must be cured for 7 days after painting before delivery. 8.

8.Keep good ventilation and wear necessary protective equipment at the construction site.

Health and Safety This is a water-based product and poses no health hazard under normal use.

It must be well ventilated during use.

IMG_0002
危险品证书
packing

Avoid excessive skin contact.

 

微信图片_20200611150908
HTB1Fi1ZccLJ8KJjy0Fnq6AFDpXac.jpg_.webp
微信图片_20200805093655
微信图片_202008050937531
微信图片_202008050937532

  • Previous:
  • Next:

  • Write your message here and send it to us