products

Water-based two-component varnish two component water based polyurethane waterproof coating from China

short description:

Waterborne two-part varnish
Product Description Special imported water-based theater, graphical system, deionized water, water-based help and other components, free of benzene, toluene, dimethyl organic ionization.
1. Low VOC, no irritating odor. 2.
2. conform to the environmental labeling product requirements, normal use without any health risks.
3. outstanding resistance to a variety of weather conditions and use of environmental performance, excellent resistance to ultraviolet radiation.
4. After curing, the paint film is tough, with excellent resistance to wear and impact resistance.
5. It can be used with water-based primer to resist the influence of industrial aggressive environment.


Product Detail

Product Tags

HTB1.HLNJXXXXXbtXpXXq6xXFXXX0.jpg_.webp
HTB1vQwKQgHqK1RjSZFkq6x.WFXaE.jpg_.webp
HTB1MqQkQgHqK1RjSZFEq6AGMXXa1.jpg_.webp
HTB18KOqhtknBKNjSZKPq6x6OFXaO.jpg_.webp
HTB18H0Od8Gw3KVjSZFD760WEpXaO.png_.webp
HTB1wDRVvH1YBuNjSszeq6yblFXa4.jpg_.webp

Application

Recommended use for storage tanks, rail transportation, functional vehicles, power facilities, transformers, distribution cabinets, machinery and equipment such as high anti-corrosion and decorative coating.

Technical parameters Drying time (25'℃) Surface drying 1 hour

Hands-on 24 hours

Drying 1 hour (60-80°C)

Fully cured 7 days

Gloss ≥80% (60°)

Film hardness H

Paint film adhesion level 4

Paint film flexibility 2mm

Impact resistance of paint film 50cm-kg

Artificial aging resistance 1000h

Surface treatment When directly applied on the surface of the primer, the primer shall be polished, clean, dry, free of rust and oil stains. When coated on the surface of the primer, the primer surface should be clean, dry and free of dirt.

Use conditions Construction temperature 10-35 ℃, mixing degree 30-75%, good ventilation conditions.

Construction instructions Ingredients A, B two components

Mixing ratio 3:1 (weight ratio)

Mixing method: Mix component A thoroughly, add component B and continue mixing until smooth.

Coating thickness Dry film thickness 20 μ m

Wet film thickness 50 μ m

Maturing period (25℃) 10-15min

Service period (25°C) 3h

Re-coating interval 12h minimum 4Bh maximum

Surface Treatment The front coat paint reading must be dry.

Remove all oil, dust and other dirt from the front paint film. No acid, breakage or water congealed on the paint film.

HTB15O96P6DpK1RjSZFrq6y78VXa7.jpg_.webp
HTB14pSPchrI8KJjy0Fpq6z5hVXa4.jpg_.webp
HTB13bI.IVXXXXcqXXXXq6xXFXXXd.jpg_.webp
HTB1WlImQXzqK1RjSZFvq6AB7VXaL.jpg_.webp
HTB15TaaKr1YBuNjSszeq6yblFXas.jpg_.webp

Quick Details

Hd031cc143ed042b4910abdaacde0b0cec.jpg_.webp
27e52fbb9549049db355ee507081b9a
IMG_0002

For the topcoat that has been circled for a long time, the paint film should be polished with sandpaper before painting the subsequent topcoat.

Temperature of the substrate The temperature of the substrate should be 3℃ above the dew point.

Coating Method Air Spray Thinner Deionized Water

Dilution amount 15-25% (paint volume note)

Nozzle diameter 1.5-2.0m

Spraying pressure 0.3-0.4Mpa (about 3-6kg/cmi)

【Color Water Paint Application Viscosity 15-25s (20℃℃)

验厂报告
Hef230fa245204a01a89445508302629d3.jpg_.webp

Waterborne two-component polyurethane topcoats

This product is made up of non-New Tongkou Nagasumi System, regional chemical new, surface ionized water, woody with N, and bad protective compound, and does not contain organic solvents such as methyl-phthalate and 3% lysine.

1. low V0C, no irritating odor.

Environmentally labeled products, no health risks from normal use.

Outstanding resistance to a wide range of weather conditions and operating environments, excellent UV resistance.

After curing, the paint film is tough and has excellent abrasion and impact resistance.

When used in conjunction with a water-based primer, it can withstand the effects of aggressive industrial environments.

Recommended use for high-security and commercial road coating of rail transit, rail traffic, functional vehicles, power facilities, transformers, distribution cabinets, machinery and equipment.

HTB1Fi1ZccLJ8KJjy0Fnq6AFDpXac.jpg_.webp
HTB1hIlILMHqK1RjSZJnq6zNLpXah.jpg_.webp
H13b0f6074ddb4893b781f4cb748d1566L.jpg_.webp

Technical parameters Drying time (25'℃) Table thousand 1 hour

Hands-on 24 hours

Drying 1 hour (60-80°C)

Fully cured 7 days

Gloss ≥80% (60°)

Film hardness 2H

Paint film adhesion level 1

Paint film flexibility 2mm

Impact resistance of paint film 50cm-kg

Artificial ageing resistance 100Ch

Surface treatment When applied directly to the surface of the primer, the primer shall be polished, clean, dry, free of rust and oil stains. When coating on the surface of the primer, the primer should be clean, dry and free of dirt.

Use conditions Construction mixing degree 10-35℃C, latent degree 30-70%, good ventilation conditions.

Construction Instructions Ingredients Ingredients A and B two components

Mix ratio 0:3 (weight ratio)

Mixing method: Mix component A thoroughly, add component B and continue to mix until uniform.

Coating thickness Dry film thickness 30 μ m

Warm film thickness 65 jμ m

theoretical dosage

Maturing period (25°C C) 6-8m'/L

10-15min (60-801)

Service period (25°C) 3h

Re-coating interval minimum 12h maximum 48h

Complete primer for front road Water-based primer, water-based intermediate paint, etc.

Surface Finish The front channel shock paint film must be dry.

Remove all the oil, dust and other dirt from the front paint. No acid, alkali or moisture on the paint film.

For the topcoat that has been painted for a long time, the paint film should be sanded before painting the subsequent topcoat.

Humidity of the substrate The temperature of the substrate should be higher than 3C above the leaning point.

HTB1_UvYBZuYBuNkSmRy763A3pXa0.png_.webp
HTB1MR5sdjfguuRjSszc762b7FXaZ.png_.webp
HTB1enBeKruWBuNjSszg7628jVXaR.png_.webp

Coating Method Air Spray Thinner Deionized Water

Dilution amount 15-25% (paint volume note)

Nozzle diameter 1.5-2.0mm

Spraying pressure 0.3-0.4Mpa "about 3-bkg/cmi)

26 Construction Viscosity 35-50s (20')

IMG_0002
危险品证书
packing

Where to use:

It is suitable for decoration and protection of surfaces of all kinds of wood, bamboo and rattan.

 

 

Recommended Paint System 2 coats of Maydos transparent putty for patching imperfection
1 coat of Maydos water-based wood varnish primer
2 coats of Maydos water-based wood finish
Clean up: Clean all equipment with clean water immediately after use
Storage:Store in cool(temperature range 5℃-45℃), dry and well-ventilated place and keep it out ofthe reach of children
Preparation and Application 1. Before application, stir the paint completely and evenly, filter and then wait until bubbles disappear.
2. The painted surface with PU, NC paint etc must be sanded completely to make it matte and then clean the sanding scrap. The application should be done evenly and do not apply too thick for one time.
3. If the wood has been applied solvent-based primer, then at least two weeks should be given to let it dry completely.
4. The wood surface must be dry, clean, strong and free of contaminants. Sand it with sanding paper (320#) in the same direction as wood grain. Fill the holes and cracks in the wood with transparent putty.
5. Apply 1-2 coats of putty on the treated wood. The recoat time is 2 hours and it is better to sand each coat with sand paper (400#). If the wood is very coarse, then more coats are suggested.
6. Dilute primer with 10-20% clean water and 2-3 coats are suggested. The recoat time is 3-4 hours and sand the first coat with sand paper (600#) and (800#) for the rest.
7. Dilute finish with 10-20% clean water and 2-3 coats are suggested. The recoat time is 4-5 hours and sand it lightly with sand paper (800-1000#).
Good Remind 1. For better application experiences, please complement with other Maydos products.
2. Application environmental condition (above 8°C and relative humidity below 85%).
3. The dilution water quantity varies from temperature and humidity. More water at low temperature and high humidity, and less at high temperature and low humidity.
4. Prevent the paint film from wetting and don’t put wet things on it before it is dry. Recoat time varies from the weather.
5. Under normal condition, the maintenance period of paint film is one week, but it should be longer in case of low humidity and thick paint film.

 

 

11987325404_1727090023
HTB1ByeWaqLN8KJjSZFGq6zjrVXa7.jpg_.webp
微信图片_20200805093655
微信图片_202008050937531
微信图片_202008050937532

Waterborne two-component polyurethane topcoats

This product is made up of non-New Tongkou Nagasumi System, regional chemical new, surface ionized water, woody with N, and bad protective compound, and does not contain organic solvents such as methyl-phthalate and 3% lysine.

1. low V0C, no irritating odor.

Environmentally labeled products, no health risks from normal use.

Outstanding resistance to a wide range of weather conditions and operating environments, excellent UV resistance.

After curing, the paint film is tough and has excellent abrasion and impact resistance.

When used in conjunction with a water-based primer, it can withstand the effects of aggressive industrial environments.


  • Previous:
  • Next:

  • Write your message here and send it to us