products

Super Lowest Price waterborne epoxy topcoat - Water-based two-component varnish two component water based polyurethane waterproof coating from China – Mit-ivy

short description:


Product Detail

Product Tags

Related Video

Feedback (2)

We are also focusing on improving the stuff management and QC system so that we could keep great advantage in the fiercely-competitive business for n-ethyl-n-cyanoethyl-m-toluidine, n-ethyl-n-cyanoethyl-m-toluidine, CAS: 118-03-6, Our products are widely recognized and trusted by users and can meet continuously changing economic and social needs.
Super Lowest Price waterborne epoxy topcoat - Water-based two-component varnish two component water based polyurethane waterproof coating from China – Mit-ivy Detail:

HTB1.HLNJXXXXXbtXpXXq6xXFXXX0.jpg_.webp
HTB1vQwKQgHqK1RjSZFkq6x.WFXaE.jpg_.webp
HTB1MqQkQgHqK1RjSZFEq6AGMXXa1.jpg_.webp
HTB18KOqhtknBKNjSZKPq6x6OFXaO.jpg_.webp
HTB18H0Od8Gw3KVjSZFD760WEpXaO.png_.webp
HTB1wDRVvH1YBuNjSszeq6yblFXa4.jpg_.webp

Application

Recommended use for storage tanks, rail transportation, functional vehicles, power facilities, transformers, distribution cabinets, machinery and equipment such as high anti-corrosion and decorative coating.

Technical parameters Drying time (25′℃) Surface drying 1 hour

Hands-on 24 hours

Drying 1 hour (60-80°C)

Fully cured 7 days

Gloss ≥80% (60°)

Film hardness H

Paint film adhesion level 4

Paint film flexibility 2mm

Impact resistance of paint film 50cm-kg

Artificial aging resistance 1000h

Surface treatment When directly applied on the surface of the primer, the primer shall be polished, clean, dry, free of rust and oil stains. When coated on the surface of the primer, the primer surface should be clean, dry and free of dirt.

Use conditions Construction temperature 10-35 ℃, mixing degree 30-75%, good ventilation conditions.

Construction instructions Ingredients A, B two components

Mixing ratio 3:1 (weight ratio)

Mixing method: Mix component A thoroughly, add component B and continue mixing until smooth.

Coating thickness Dry film thickness 20 μ m

Wet film thickness 50 μ m

Maturing period (25℃) 10-15min

Service period (25°C) 3h

Re-coating interval 12h minimum 4Bh maximum

Surface Treatment The front coat paint reading must be dry.

Remove all oil, dust and other dirt from the front paint film. No acid, breakage or water congealed on the paint film.

 

HTB13bI.IVXXXXcqXXXXq6xXFXXXd.jpg_.webp
HTB1WlImQXzqK1RjSZFvq6AB7VXaL.jpg_.webp
HTB15TaaKr1YBuNjSszeq6yblFXas.jpg_.webp

Quick Details

For the topcoat that has been circled for a long time, the paint film should be polished with sandpaper before painting the subsequent topcoat.

Temperature of the substrate The temperature of the substrate should be 3℃ above the dew point.

Coating Method Air Spray Thinner Deionized Water

Dilution amount 15-25% (paint volume note)

Nozzle diameter 1.5-2.0m

Spraying pressure 0.3-0.4Mpa (about 3-6kg/cmi)

【Color Water Paint Application Viscosity 15-25s (20℃℃)

 

Waterborne two-component polyurethane topcoats

This product is made up of non-New Tongkou Nagasumi System, regional chemical new, surface ionized water, woody with N, and bad protective compound, and does not contain organic solvents such as methyl-phthalate and 3% lysine.

1. low V0C, no irritating odor.

Environmentally labeled products, no health risks from normal use.

Outstanding resistance to a wide range of weather conditions and operating environments, excellent UV resistance.

After curing, the paint film is tough and has excellent abrasion and impact resistance.

When used in conjunction with a water-based primer, it can withstand the effects of aggressive industrial environments.

 


Product detail pictures:

Super Lowest Price waterborne epoxy topcoat - Water-based two-component varnish  two component water based polyurethane waterproof coating from China – Mit-ivy detail pictures

Super Lowest Price waterborne epoxy topcoat - Water-based two-component varnish  two component water based polyurethane waterproof coating from China – Mit-ivy detail pictures

Super Lowest Price waterborne epoxy topcoat - Water-based two-component varnish  two component water based polyurethane waterproof coating from China – Mit-ivy detail pictures

Super Lowest Price waterborne epoxy topcoat - Water-based two-component varnish  two component water based polyurethane waterproof coating from China – Mit-ivy detail pictures

Super Lowest Price waterborne epoxy topcoat - Water-based two-component varnish  two component water based polyurethane waterproof coating from China – Mit-ivy detail pictures

Super Lowest Price waterborne epoxy topcoat - Water-based two-component varnish  two component water based polyurethane waterproof coating from China – Mit-ivy detail pictures

Super Lowest Price waterborne epoxy topcoat - Water-based two-component varnish  two component water based polyurethane waterproof coating from China – Mit-ivy detail pictures


Related Product Guide:
CAS No. [95-68-1] Production process. 2,4-Dimethylaniline
Mit-ivy industry Flocculant for paint fog waste water treatment Paint fog flocculant to treat paint waste water Water treatment chemicals for spray booth

While in the past few years, our organization absorbed and digested innovative technologies both equally at home and abroad. Meanwhile, our organization staffs a group of experts devoted for the advancement of Super Lowest Price waterborne epoxy topcoat - Water-based two-component varnish two component water based polyurethane waterproof coating from China – Mit-ivy , The product will supply to all over the world, such as: Nepal, Malawi, Hyderabad, "Good quality and reasonable price" are our business principles. If you are interested in our products or have any questions, make sure you feel free to contact us. We hope to establish cooperative relationships with you in the near future.
Timely delivery, strict implementation of the contract provisions of the goods, encountered special circumstances, but also actively cooperate, a trustworthy company!
5 Stars By Mary from Doha - 2017.03.28 16:34
Products and services are very good, our leader is very satisfied with this procurement, it is better than we expected,
5 Stars By Anna from Lahore - 2018.05.13 17:00
Write your message here and send it to us